Chapter 10, Problem 14P

a)

Summary Introduction

To determine: The results of the run test.

Introduction: Run chart refers to a line graph that displays the recorded data based on the time sequence.

a)

Expert Solution
Check Mark

Answer to Problem 14P

The result of the run test suggests that the output possess randomness.

Explanation of Solution

Given information:

Test z-score
Median +1.37
Up/Down +1.05

By observing the given data of median +1.37 (< ±2) and up/down +1.05 (< ±2), it can be concluded that they are within the statistical limits of ±2.

Hence, the result of the run test suggests that the output possess randomness.

b)

Summary Introduction

To determine: The results of the run test.

Introduction: Run chart refers to a line graph that displays the recorded data based on the time sequence.

b)

Expert Solution
Check Mark

Answer to Problem 14P

The results of the median run test and up/down test is random and no non randomness is detected.

Explanation of Solution

Given information:

Numberofmeans=20Numberofrunscountedabove/below=14Numberofrunscountedup/down=8

Formula:

Ztest=Observed-ExpectedStandarddeviation

Calculation of expected number of runs:

Observed number of runs = 14

E(r)med=N2+1=202+1=11.0

The expected number of runs is calculated by adding half of the total number of samples with 1 which gives 11.

Calculation of standard deviation:

σmed=N14=2014=2.18

Standard deviation is calculated by subtracting number of sample 20 from 1 and dividing the resultant by 4 and taking square for the value which yields 2.18.

Ztest=14-112.18=+1.38

The z factor for median is calculated by dividing the difference of 14 and 11 with 2.18 which yields +1.38 which is within the test statistics of ±2.00 and no non-randomness exist.

Up/Down Test:

The observed number of runs is 8.

Calculation of expected number of runs:

E(r)u/d=2N13=(2×20)13=13.0

The expected number of runs is calculated by subtracting the double of the number of samples 20 and subtracting from1 and dividing the resultant with 3 which gives 13.

Calculation of standard deviation:

σu/d=16N2990=(16×20)2990=1.80

Standard deviation is calculated by multiplying the number of samples with 16 and subtracting the resultant from 29 and then dividing the resulting value with 90 and taking square root which yields 1.80.

Ztest=8-13.01.80=2.78

The z factor for median is calculated by dividing the difference of 8 and 13 with 1.80 which yields -2.78 which is beyond the test statistics of ±2.00 which is non-random.

Hence, the result of the median run test is random and up/down test is no non randomness is detected.

c)

Summary Introduction

To determine: The results of the run test.

Introduction: Run chart refers to a line graph that displays the recorded data based on the time sequence.

c)

Expert Solution
Check Mark

Answer to Problem 14P

The results of the median run test and up/down test is random and no non randomness is detected.

Explanation of Solution

Given information:

Cable 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Defects 2 3 1 0 1 3 2 0 2 1 3 1 2 0

Formula:

Ztest=Observed-ExpectedStandarddeviation

Analysis of data:

Operations Management, Chapter 10, Problem 14P , additional homework tip  1

c¯=2114=1.5

To make analysis of data, the given data is compared with median (center line) to make A/B and U/D which is shown below,

Median run test:

From analysis, the observed number of runs is 10 and median is 1.5.

Calculation of expected number of runs:

E(r)med=N2+1=142+1=8.0

The expected number of runs is calculated by adding half of the total number of samples with 1 which gives 8.

Calculation of standard deviation:

σmed=N14=1414=1.80

Standard deviation is calculated by subtracting number of sample 14 from 1 and dividing the resultant by 4 and taking square for the value which yields 1.80.

Ztest=10-81.80=+1.11

The z factor for median is calculated by dividing the difference of 10 and 8 with 1.80 which yields +1.11 which is within the test statistics of ±2.00 and no non-randomness exist.

Up/Down Test:

The observed number of runs from the analysis is 10.

Calculation of expected number of runs:

E(r)u/d=2N13=(2×14)13=9.0

The expected number of runs is calculated by subtracting the double of the number of samples 14 and subtracting from1 and dividing the resultant with 3 which gives 9.0.

Calculation of standard deviation:

σu/d=16N2990=(16×14)2990=1.47

Standard deviation is calculated by multiplying the number of samples with 14 and subtracting the resultant from 29 and then dividing the resulting value with 90 and taking square root which yields 1.47.

Ztest=10-9.01.47=+0.68

The z factor for median is calculated by dividing the difference of 10 and 9 with 1.47 which yields +0.68which is within the test statistics of ±2.00.

Hence, the results of the median run test and up/down test is random and no non randomness is detected.

d)

Summary Introduction

To determine:The results of the run test.

Introduction: Run chart refers to a line graph that displays the recorded data based on the time sequence.

d)

Expert Solution
Check Mark

Answer to Problem 14P

The results of the median run test and up/down test is random and no non randomness is detected.

Explanation of Solution

Given information:

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Comp. 4 10 14 8 9 6 5 12 13 7 6 4 2 10

Formula:

Ztest=Observed-ExpectedStandarddeviation

Analysis of data:

Operations Management, Chapter 10, Problem 14P , additional homework tip  2

c¯=11014=7.875

To make analysis of data, the given data is compared with median (center line) to make A/B and U/D which is shown below,

Median run test:

From analysis, the observed number of runs is 8.

Calculation of expected number of runs:

E(r)med=N2+1=142+1=8.0

The expected number of runs is calculated by adding half of the total number of samples with 1 which gives 8.

Calculation of standard deviation:

σmed=N14=1414=1.80

Standard deviation is calculated by subtracting number of sample 14 from 1 and dividing the resultant by 4 and taking square for the value which yields 1.80.

Ztest=6-81.80=1.11

The z factor for median is calculated by dividing the difference of 6 and 8 with 1.80 which yields -1.11 which is beyond the test statistics of ±2.00 and non-randomness exist.

Up/Down Test:

The observed number of runs from the analysis is 7.

Calculation of expected number of runs:

E(r)u/d=2N13=(2×14)13=9.0

The expected number of runs is calculated by subtracting the double of the number of samples 26 and subtracting from1 and dividing the resultant with 3 which gives 9.0.

Calculation of standard deviation:

σu/d=16N2990=(16×14)2990=1.47

Standard deviation is calculated by multiplying the number of samples with 16 and subtracting the resultant from 29 and then dividing the resulting value with 90 and taking square root which yields 1.47.

Ztest=7-9.01.47=1.36

The z factor for median is calculated by dividing the difference of 7 and 9 with 1.47 which yields -1.36 which is within the test statistics of ±2.00.

Hence, the results of the median run test and up/down test is random and no non randomness is detected.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Production phase After the pre-production phase, the product entered the production phase without introducing any changes in the process. Since it seemed to be stable SPC was not performed for several months, with process stability and variability being assessed by the level of nonconformities it it produced. However, after a time, an increasing number of customer complaints due to products supplied outside the specification/. The Quality Engineer decided to take 20 samples from the process with regular spacing between samples. Each sample is made up of 3 parts. The data obtained for the highlighted dimension samples are presented in Table 2 below: measurements in mm for critical sample dimension number 1 2 3 4 5 6 7 8 9 Observations 2 3 50.767 1 50.972 50.785 50.956 50.97 50.914 51.066 50.933 51.086 50.917 51.081 51.092 50.948 50.828 51.054 50.859 51.083 50.789 50.984 50.961 50.943 51.013 51.02 50.734 50.898 50.956 50.885 51.004 50.984 50.839 Table 2: Measurements in mm for critical…
4. Problem 8.29 The number of imperfections in bond paper produced by a paper mill is observed over a period of several days. Table 8-28 shows the area inspected and the number of imperfections for 25 samples. Construct a control chart for the number of imperfections per square meter. Revise the limits, if necessary, assuming special causes for the out-of-control points. TABLE 8-28 Area Area Sample Inspected (m?) Imperfections Sample Inspected (m²) Imperfections 1 150 6 14 300 8 2 100 8 15 300 12 3 200 5 16 200 6 4 150 4 17 150 4 250 10 18 200 7 6. 100 11 19 150 14 7 150 20 100 4 8 200 5 21 100 8 9 300 10 22 200 10 250 10 23 300 12 11 100 24 250 7 12 200 4 25 200 5 13 250 12
P-chart and c-chart. Using the appropriate control chart, determine two-sigma controllimits for each Problem case, a. An inspector found an average of 3.9 scratches in the exterior paint of each of theautomobiles being prepared for shipment to dealers. b. Before shipping lawnmowers to dealers, an inspector attempts to start each mowerand notes any that do not start on the first try. The lot size is 100 mowers, and anaverage of 4 did not start (4 percent).
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.