Metal frames for kick scooters are manufactured in two stages: Stamping and assembly. Each frame is made up of two pieces: one part A and one part B. Currently, the stamping machine rotates its production between 120 part A’s and 120 part B’s. In the stamping machine, setup times and production rates for each part are follows:   Part A Part B Setup time (mins) 70 110 Production rate (parts per hour) 80 80 Completed parts move to assembly stage only when the entire batch is produced. At assembly, parts are assembled manually to form the finished products. The two parts and a number of small purchased components are required for each unit of final product. Each product requires 30 minutes of labor time to assemble. There are 15 workers in assembly. There is sufficient demand to sell every scooter the system can make. At the current batch size, what is the capacity of stage 1 (stamping) in [units per hour]? At the current batch size, which stage is the bottleneck of the system? Keeping everything else constant, what is the smallest batch size such that the process capacity is as large as possible?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question

Metal frames for kick scooters are manufactured in two stages: Stamping and assembly.

Each frame is made up of two pieces: one part A and one part B. Currently, the stamping machine rotates its production between 120 part A’s and 120 part B’s.

In the stamping machine, setup times and production rates for each part are follows:

 

Part A

Part B

Setup time (mins)

70

110

Production rate (parts per hour)

80

80

Completed parts move to assembly stage only when the entire batch is produced.

At assembly, parts are assembled manually to form the finished products. The two parts and a number of small purchased components are required for each unit of final product. Each product requires 30 minutes of labor time to assemble. There are 15 workers in assembly. There is sufficient demand to sell every scooter the system can make.

  1. At the current batch size, what is the capacity of stage 1 (stamping) in [units per hour]?
  2. At the current batch size, which stage is the bottleneck of the system?
  3. Keeping everything else constant, what is the smallest batch size such that the process capacity is as large as possible?

 

 

 

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Optimization models
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.