Compute the required cycle time for a process that operates 8 hours daily with two 15 min break and requires an output of 350 units per day.
Q: Calculate the average time required to produce one piece per hour if there are five machines with…
A: Given data is Number of machines = 5 Machining time per piece = 0.6 hours Servicing time per piece =…
Q: A manufacturing firm maintains one product assembly line to produce signal generators. Weekly demand…
A: Production is the process of converting inputs into finished products and services for the…
Q: Donut Love makes hand made artisan donuts in several locations throughout New Hampshire,. Assume…
A: Step Number of parallel stations/Resources Processing time for each resource (min/unit) Prep 1 30…
Q: The production process shown below consists of five stages. The numbers in parentheses are the times…
A: a.
Q: An automated car wash serves customers with the following serial process: pre-treat,wash, rinse,…
A: Flow rate of the process is also regarded as the throughput and it is defined as the number of flow…
Q: is the bottleneck. b) The bottleneck time is minutes per unit (round your response to two decimal…
A: Processing time = 60 minutes/Capacity Sewing = 60/1.8 = 33.33 minutes per unit Sanding = 60/5 = 12…
Q: Discuss each statement given below whether its true or false and explain briefly (a) If cycle time…
A: If cycle time is increased number of workers should also be increased to respond to related change.…
Q: Consider a process consisting of five resources that are operated 8 hours per day. Theprocess works…
A: Given data is Product A = 40 units per day Product B = 50 units per day Product C = 60 units per day…
Q: Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Takt time is described as the time or the rate at which products are needed to be manufactured in…
Q: A restaurant has a maximum capacity to serve 60 customers at any given point of time. However, over…
A: Given- Restaurant Max capacity = 60 customers Output (Customer Serving) = 70 customers
Q: In-process inventory is less in product layout. Select one: O a. False b. True
A: True
Q: A firm uses a serial assembly system and needs answers to the following: An output of 900 units…
A: Given: Desired output = 900 units time = 7.5 hours work content at each station = 30 seconds
Q: Currently, Rock View Restaurant has a single window with one person who takes the order, gather the…
A: given,
Q: Compute the takt time for a system where the total time per shift is 420 minutes, there is one…
A: The answer is as below:
Q: Given the following information, compute the takt time: Total time per shift is 480 minutesper day,…
A: Formula:
Q: The manufacturing cycle efficiency for Sam Company when the processing time is seven hours and…
A: Throughput time is the total actual time incurred during the production of the product in an…
Q: What is the effect of waiting time on a manufacturing process? Why is it good to reduce waiting…
A: Waiting time essentially affects producing measure. The longer the cycle is in pausing, the higher…
Q: The Swanky Hotel provides room service for its guests. The process for room service begins with a…
A: “Hey, since there are multiple questions posted, we will answer the first three sub-parts. If you…
Q: People are served in a process with two resources. The first resource has a capacity of 1.4 people…
A: Given, Total capacity of resource = Capacity * Number of workers Additional worker = 3+1 = 4 Total…
Q: Assuming an eight-hour workday, compute the cycle time needed to obtain an output of 400 units per…
A: Hours per day (H) = 8 Minutes per hour (M) = 60 Output per day (O) = 400 units
Q: The three-station work cell illustrated in the figure below has a product that must go through one…
A: Hello thank you for the question. As per guidelines, we would provide only 3 sub-parts at a time.…
Q: A work cell at Chris Ellis Commercial Laundry hasa workstation with two machines, and each unit…
A: Given- Production capacity = 4 units per hour No. of machines = 2
Q: Loans are evaluated in a process with two resources. The first resource has a capacity of 0.33 loans…
A: In the above question the following information is given: First resource capacity is 0.33. Second…
Q: An assembly line with 28 tasks is to be balanced. The total time required for all 28 tasks is 39…
A: Given that: Number of tasks = 28 Time required to complete 28 tasks = 39 mins Operating time per…
Q: A manufacturing plant has the process displayed below. The drilling operation occurs separately from…
A: Given that: Capacity per hour Sawing 5 Sanding 5 Drilling 5 Welding 2.3 Assembly…
Q: Given the following information, compute the takt time: Total time per shift is 480 minutes per day,…
A: Takt Time = Net time available per day/ Daily demand Daily demand = 80
Q: Cans are made in a process with two resources. The first resource has a capacity of 11 cans per…
A: Given: 1st resource capacity =11 cans/sec2nd resource capacity =10 cans/sec 1st resource has workers…
Q: Meals are cooked in a process with two resources, The first cesource has a capacity of 9.5 meals per…
A: Given - Process Demand = 7.2 meals per hour 1st Resource capacity = 9.5 meals per hour 2nd Resource…
Q: Of the following process types, ________ has the lowest output variety, and the highest output…
A: The operations management process can be divided into four groups based on how they are performed.…
Q: A process has 2 steps: Step A and Step B. The stage capacities of the two steps are listed in the…
A: Here the process has 2 steps, step A and step B, for each step, we have the stage capacity, to…
Q: If the desired output is 30 parts and available time to produce the output is 60 minutes, what is…
A: Cycle time is the total elapsed time to move a unit of work from the beginning to the end of a…
Q: A work center assigns tasks to 7 work stations. The total of all the task times is 24. If the cycle…
A: Remember the formulas for this problem Total time taken = No. of stations * Cycle time Efficiency =…
Q: What are the risks of automating a production process? What are the risks for a service process?
A: The production process is the process in which different activities, materials, technologies, and…
Q: is the bottleneck. b) The bottleneck time is minutes per unit (round your response to two decimal…
A: Given Information: Process/Workstation name Process capacity Sawing 1.8 units per hour…
Q: An assembly line for inkjet printers is composed of 8 persons performing different tasks. Compute…
A: Given data is Net time = 8 hours = 480 minutes Net demand = 760 units(i.e. 95 units in one hour)
Q: is the bottleneck. b) The bottleneck time is c) The throughput time of the overall system is minutes…
A: First, I will determine the time required (in minutes) to process a unit for each of the…
Q: Loans are evaluated in a process with two sequential resources. The capacities of the resources are…
A: Given, Loans are utilized in a process with two sequential resources with, Capacity C1 =0.16 loans…
Q: Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Formula:
Q: Four employees at a fast-food restaurant each perform one of the four activities in serving a…
A: From the above given information, Greet customer = 2 seconds Taking order = 30 seconds Processing…
Q: A firm uses a serial assembly system and needs answers to the following:a. An output of 900 units…
A:
Q: 7. Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Given data; Total time per shift 480 min No. of shifts 1 shift Rest break 30 min Lunch…
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: Number of resources = 2 The capacity of resource 1 = 2.1 Apples pe minute The capacity of resource 2…
Q: Consider a two-station production line. Station 1 consists of a single machine with an average…
A:
Q: Weekly production requirements of a product are 1000 items. The cycle time of producing one product…
A: Required number of machinery is the proportion between Total machinery hours required to produce…
Q: Xercise only contains parts and g. ) The cycle time for the production of a chair is 9.23 minutes…
A: Below is the solution;-
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: Process cycle time indicating the average time required to complete a unit of item. Here, we can…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
- A local bakery is renowned for its elaborately cecorated sheet cakes. Consider the following process information: One baker is ivailable to prepare the cake batter (measuring and mixing ingredients and then adding it to baking pans). On average, this takes 10 minutes to prepare two cakes, ie. to make enough batter for 2 cakes and to add the batter to 2 cake pans. Move time to add and remove them from the oven is neglig bile, it takes 32 minutes to bake cakes - the bakery has two ovens, each able to hold 2 cakes. The one pastry chef on staff puts on an amazing show that draws a crowd all day-each cake is decorated in 6 minutes. The bakery operates 8 hours per day. Answer each of the following questions: a. What is the cycle time (in minutes per cake) of each stage - preparing, baking, and decorating? b. What is the dally process capacity? Explain. c. If orders arrive at a rate of 3 cakes every 20 minutes, can the bakery meet the caily demand Explain, Note: Be clear about how you…A staff assistant at NUBD Corporation recently determined that the first four units completed in a new manufacturing process took 1,000 hours to complete, or an average of 250 hours per unit. The assistant also found that when the cumulative output produced doubles, the average labor time declines by 25%. On the basis of this information, how many total hours would NUBD use if it produces 16 units?A machine operates with the following production cycle: 15 minutes of setup,45 minutes of production. While in production the machine produces 2 parts per minute.What is the capacity of the machine in parts per minute?
- C&A Candy produces two kinds of gumdrops: regular and sugar-free. The data on these gumdrops are given below: Regular Sugar-Free 30 10 60 30 80 80 Demand (lbs per hour) Changeover time (min) Production rate (lbs per hour) C&A first makes 60 pounds of regular gumdrops, then 20 pounds of sugar-free gumdrops, and then repeats this sequence. What is the utilization of the production process? Multiple Choice O O O 25% 20% 50% 40%25. Two parallel activities in a process can have different capacities. True FalseMr. K’s is a very popular hair salon. It offers high quality hairstyling andphysical relaxation services at a reasonable price, so it always has unlimiteddemand. The service process includes five activities that are conducted inthe sequence described below ( the time required for each activity is shownin parenthesis):Activity 1: Welcome a guest and offer homemade herb tea (10 minutes)Activity 2: Wash and condition har (10 minutes)Activity 3: Neck, shoulder, and back stress release massage (10 minutes)Activity 4: Design and hair style and do the hair (25 minutes)Activity 5: Ring up the guest bill (5 minutes)Each activity has one employee dedicated to it. For the following questions,assume unlimited demand. Also assume that the employee at activity 1 onlyadmits new guests at the rate of the bottleneck.(a) Which resource is the bottleneck?(b) What is the capacity of the process?(c) What is the flow rate?(d) What is the utilization of the employee at activity 3(e) What is the cycle time?
- A department works one 8-hour shift, 250 days a year, and has these figures for usage of amachine that is currently being considered:ProductAnnualDemandStandard ProcessingTime per Unit (hr)Processing TimeNeeded (hr)1 400 5.0 2,0002 300 8.0 2,4003 700 2.0 1,4005,800Units of capacity needed = Processing time needed ___________________________ Processing time capacity per unit (5–3)Working one 8-hour shift 250 days a year provides an annual capacity of 8 × 250 =2,000 hours per year. Consequently, three of these machines would be needed to handle therequired volume:5,800 hours __________________ 2,000Navern Corporation manufactures and sells custom home elevators. From the time an order is placed until the time the elevator is installed in the customer's home averages 141 days. The 141 days are spent as follows: Wait time Inspection time Process time Move time Queue time What is Navern's manufacturing cycle efficiency (MCE) for its elevators? Multiple Choice O O 41.1% 30.4% 58.9% 29 days 24 days 34 days 31 days 23 days 57.4%A process makes two products, A and B, and operates 5 days per week, 8 hoursper day. Demand for the two products for the next week is as follows:Day 1: A: 4; B: 6Day 2: A: 5; B: 5Day 3: A: 6; B: 4Day 4: A: 7; B: 3Day 5: A: 3; B: 7What is the takt time of the process? What would a level production schedule look like?
- Travelers are the flow unit in a process with two resources. The capacities of the resources are 1.3 and 0.88 travelers per second. Demand occurs at the rate 1.3 travelers per second. Instruction: Round your answer to one decimal place. What is the utilization (%) of the first resource? %A manufacturer has a production line with 4 serial machines and each unit needs to pass through all machines in order to be completed. The capacity rates of the machines are as follows, 6, 2, 3, and 8 units per hour. What is the capacity rate of the process in units/minute? 2/60 2 19/60 1/60Answer is complete but not entirely correct. A campus deli serves 300 customers over its busy lunch period from 11:30 am to 1:30 pm. A quick count of the number of customers waiting in line and being served by the sandwich makers shows that an average of 7 customers are in process at any point in time. What is the average amount of time that a customer spends in process? Instruction: Round your intermediate and final answer to 1 decimal place. Average amount of time (Round to one decimal) 4.9 8 minutes